Reserved settlement input and custom decision-scope disposition

Source baseline: 323c3053128e41e16df27e6b6498f83c37e81f5e. Refs #4447, original Stage 2a/2b source treatment and Stage 3 owner disposition. This is a concrete proposal for review and integration, not a record of an earlier maintainer approval. It does not close the issue or replace the 26-entry inventory in #6270.

settlement_failure_kind.cancelled

Keep cancelled as a reader-reserved wire value in the existing vocabulary. The Python and TypeScript decoders already admit it. Current built-in settlement branches do not produce it; cancellation in Host, chat, lease or usage contracts must not be counted as its producer. No new runtime cancellation mechanism is introduced to make the value appear live.

The existing compatibility_only metadata now states why that admitted input is retained and the exit condition. This is a compatibility commitment, not proof that any historical producer emitted the value. A supplied cancelled envelope remains a failure: bind must stop before the next callback and preserve prior receipts and failure details. It neither erases an already committed step nor proves an in-flight provider effect stopped. It grants no automatic retry, rollback, resume or quota authority. A provider outcome that is actually unknown continues to use its owning observation/reconciliation contract; cancelled cannot settle that uncertainty by relabeling it.

Replace the reservation only through one of these owner-reviewed changes:

  • a real typed cancellation contract that distinguishes before-dispatch cancellation from ambiguous after-dispatch effects, with producer and real caller witnesses plus updated source treatment; or
  • explicit versioned reader migration/removal with caller and stored-envelope compatibility evidence.

There is no automatic expiry, invented external canceller, decoder narrowing, or forced vocabulary retirement. F1/F2 remains the existing six-entry domain.

todo_decision_scope_kind.other

other is explicitly authored custom decision authority when none of the six named kinds describes the actual approval. Prefer a named kind whenever it applies; uncertainty about the intended decision is not a reason to select other. The existing task text explains the decision and a stable public-safe scope key identifies it for both gate and dependent work. See the authoring rule and example.

For example, other:action:study_conflict_review may name an owner-required conflict-of-interest review. It is independent of private source access, resource spend, direction changes or public publication, which keep their named kinds. other:action:study_method_review is another custom decision, not a synonym or fallback.

Matching uses the same typed owner as every other kind. Exact kind is always required, so even other:global:* cannot cover a named kind. Key, granularity, recipient and exact Todo target rules remain intact. Unknown/misspelled kinds still reject; no parser fallback converts them to other. Declaring a kind is not approval: existing linked-gate completion or standing authority consumes only the scopes it actually covers.

Evidence and remaining acceptance

Reuse the existing all-value settlement decoder, unknown-input and bind short-circuit witnesses. Extend their actual IPC/decoder path to preserve a supplied reserved failure with prior committed receipts and details; this is reader coverage, never internal producer evidence. Reuse existing Todo lifecycle helpers and native TypeScript matching to exercise a custom approval alongside a different custom requirement and a named permission requirement. Only the selected custom scope may be consumed. A broad custom scope cannot cover any named kind, and malformed input cannot become custom authority.

The registry still has 26 entries and the same values/owners. No budgets, formal proof domains, wire schemas, runtime defaults or persisted formats are changed. Tests alone do not approve these dispositions. Final #4447 acceptance still requires owner review/integration of this proposal, the current source inventory, and passed/failed/untested evidence on the final integrated revision. Earlier records of unresolved meaning remain historical; they are not rewritten as if this decision had already existed.